Issue |
EPJ Web Conf.
Volume 285, 2023
30th Conference of the International Nuclear Target Development Society (INTDS2022)
|
|
---|---|---|
Article Number | 08001 | |
Number of page(s) | 4 | |
Section | Targets for Beam Development | |
DOI | https://doi.org/10.1051/epjconf/202328508001 | |
Published online | 22 June 2023 |
https://doi.org/10.1051/epjconf/202328508001
Ni target development for the TULIP project
1 GANIL, Grand Accélérateur National d’Ions Lourds, Bvd H. Becquerel, BP55027 14076 Caen cedex5, France
2 IJCLab, Institut Joliot Curie Laboratory, 15 Rue Georges Clemenceau, 91400 Orsay, France
* Corresponding author: jardin@ganil.fr
Published online: 22 June 2023
The TULIP project (https://anr.fr/Projet-ANR-18-CE31-0023) aims to produce radioactive ion beams of short-lived neutron-deficient isotopes using fusion-evaporation nuclear reactions in an Isotope Separator On Line (ISOL) system. A Ni target was chosen to produce Rb and Sn isotopes, and was bombarded, respectively, by Ne and Cr primary beams at energies close to the Coulomb barrier. Owing to the Target Ion Source System (TISS) configuration, the operational TISS temperature had to be close to 1300°C. Several tests were performed to determine a configuration able to cope with the constraints related to the TISS, target and beam. This article presents a brief description of the TULIP principles and objectives, and the development of the Ni target.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.