CENDL project, the chinese evaluated nuclear data library
China Nuclear Data Center, China Committee of Nuclear Data, Key Laboratory of Nuclear Data Measurement and Evaluation, China Institute of Atomic Energy, PO Box 275(41), Beijing 102413, China
a e-mail: gezg@ciae.ac.cn
Published online: 13 September 2017
The status of Chinese Evaluated Nuclear Data Library (CENDL) and the relevant CENDL project are introduced in this paper. Recently, a new version CENDL-3.2b0 was being prepared on the basis of the previous CENDL-3.1. The data in the light and actinide nuclide regions are updated from CENDL-3.1, and the new evaluations and calculations are performed mainly around structure and fission product nuclide regions. Covariance was also evaluated for structure and actinide nuclides. At the same time, the methodologies are systematically developed to fulfil the requirements of evaluations for CENDL-3.2b0. The updated nuclear reaction models for light and middle-heavy nuclides, non-model dependent nuclear data evaluation, covariance evaluation approaches, systematics, and integral validation system of nuclear data are incorporated in present CENDL project. The future developments are also planned.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.