Issue |
EPJ Web of Conferences
Volume 32, 2012
EC-17 – 17th Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Resonance Heating
|
|
---|---|---|
Article Number | 02016 | |
Number of page(s) | 6 | |
Section | ECRH and ECCD session | |
DOI | https://doi.org/10.1051/epjconf/20123202016 | |
Published online | 06 September 2012 |
https://doi.org/10.1051/epjconf/20123202016
Studies on absorption of EC waves in assisted startup experiment on FTU
1 Istituto di Fisica del Plasma, CNR, EURATOM-ENEA Association, Milan, Italy
2 EURATOM-ENEA Association, C.R. Frascati, Italy
Assistance of EC wave for plasma breakdown and current ramp up is the proposed scenario for the ITER case, characterized by low toroidal electric field. The experimental results on many tokamaks clearly indicate the capabilities of the proposed scheme to have a robust breakdown in ITER. The key aspect of this technique is the EC power required, strongly related to the absorption of the wave in the initial stage of plasma formation. This aspect is generally neglected due to the diagnostics difficulties in the plasma formation phase. As a consequence a multi-pass absorption scheme is usually considered reasonable, leading to a strong absorption after many reflections on the walls. The present study exploits the high temporal and spatial resolution of the fast scanning interferometer of FTU together with the measure of residual power obtained by a sniffer probe. The absorbed EC power is calculated considering also the polarization rotation and the subsequent mode conversion after incidence on the internal wall and compared with that derived from experimental data. The resulting EC power distribution can explain differences observed between perpendicular and oblique injection results, indicating future investigations to define ITER power requirements.
© Owned by the authors, published by EDP Sciences 2012
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.