Issue |
EPJ Web of Conferences
Volume 44, 2013
ICNP’1 – 1st International Conference On Numerical Physics
|
|
---|---|---|
Article Number | 03005 | |
Number of page(s) | 5 | |
Section | Materials Science | |
DOI | https://doi.org/10.1051/epjconf/20134403005 | |
Published online | 25 March 2013 |
https://doi.org/10.1051/epjconf/20134403005
Numerical simulation of barrier height effect on output parameters, for a a-Si:H/nc-Si:H based solar cell
Laboratoire de Physique des Plasmas, Matériaux Conducteurs et leurs Applications (LPPMCA), Université des Sciences et de la Technologie d’Oran. USTO “M.B.”, BP 1505 El-M’naouer. Oran 31000, Algérie
a e-mail: a_1974b@yahoo.fr
A numerical simulation by AMPS-1D (Analysis of Microelectronic and photonic structures) program has been carried out to examine the role of the front contact barrier heights φb0 , ITO/P nanocrystalline layer contact, on the performances of a-Si:H n-i-p’-p solar cell with no back reflector. The p’-nc-Si:H buffer layer has been incorporated at the i/p interface in order to passivate the interface defects. Output parameters, like short circuit current (JSC), open circuit voltage (VOC), fill factor (FF) and efficiency (Eff); for n-i-p’-p structure, are numerically simulated using different values φb0. The short circuit current is not very affected by φb0. However, for high values of φb0 the other output cell parameters increase. The best values of VOC, FF and Efficiency can be obtained for a value of φb0 about 1.65 eV.
Key words: numerical simulation / solar cell / a-Si:H silicon / ITO / barrier height
© Owned by the authors, published by EDP Sciences, 2013
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 2.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.