Issue |
EPJ Web of Conferences
Volume 59, 2013
IFSA 2011 – Seventh International Conference on Inertial Fusion Sciences and Applications
|
|
---|---|---|
Article Number | 11002 | |
Number of page(s) | 5 | |
Section | XI. IFE Power Plant Technologies (Including Material Studies) | |
DOI | https://doi.org/10.1051/epjconf/20135911002 | |
Published online | 15 November 2013 |
https://doi.org/10.1051/epjconf/20135911002
Overview of the LIFE fuel cycle
1 Lawrence Livermore National Laboratory, Livermore, CA, USA
2 Savannah River National Laboratory, Aiken, SC, USA
3 Los Alamos National Laboratory, Los Alamos, NM, USA
4 Princeton Plasma Physics Laboratory, Princeton, NJ, USA
5 Argonne National Laboratory, Argonne, IL, USA
a e-mail: reyes20@llnl.gov
Published online: 15 November 2013
The Laser Inertial Fusion Energy (LIFE) engine is a laser-driven inertial fusion energy system being developed with the goal to deliver fusion power in the next decade. A pre-conceptual design is being developed for the LIFE fuel cycle, with the purpose of maximizing the potential safety advantages of fusion energy. Some key features of the LIFE fuel cycle include a high tritium fuel burn-up fraction, a relatively high tritium breeding ratio, low tritium permeation from the coolant/breeder, and limited tritium inventories throughout the facility. The present paper offers an overview the pre-conceptual design of the LIFE fuel cycle, including a summary of the development plan for the delivery of the related tritium processing equipment.
© Owned by the authors, published by EDP Sciences, 2013
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 2.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.