Issue |
EPJ Web of Conferences
Volume 60, 2013
LHCP 2013 – Large Hadron Collider Physics 2013
|
|
---|---|---|
Article Number | 20057 | |
Number of page(s) | 3 | |
Section | Poster Session | |
DOI | https://doi.org/10.1051/epjconf/20136020057 | |
Published online | 26 November 2013 |
https://doi.org/10.1051/epjconf/20136020057
Upgrading the ATLAS Tile Calorimeter Electronics
Instituto de Física Corpuscular – Universidad de Valencia
a Corresponding author: fernando.carrio@cern.ch
Published online: 26 November 2013
This work summarizes the status of the on-detector and off-detector electronics developments for the Phase 2 Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2022. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in the middle of 2014 during the first Long Shutdown. For the on-detector readout, three different front-end boards (FEB) alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The Main Board will provide communication and control to the FEBs and the Daughter Board will transmit the digitized data to the off-detector electronics in the counting room, where the super Read-Out Driver (sROD) will perform processing tasks on them and will be the interface to the trigger levels 0, 1 and 2.
© Owned by the authors, published by EDP Sciences, 2013
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 2.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.