Issue |
EPJ Web of Conferences
Volume 73, 2014
MENU 2013 – 13th International Conference Meson-Nucleon Physics and the Structure of the Nucleon
|
|
---|---|---|
Article Number | 08006 | |
Number of page(s) | 5 | |
Section | Future Facilities | |
DOI | https://doi.org/10.1051/epjconf/20147308006 | |
Published online | 09 June 2014 |
https://doi.org/10.1051/epjconf/20147308006
The Italian Tau/charm project
INFN Frascati National Laboratories, Accelerator Division, via E. Fermi 40, 00044 Frascati, Italy
a e-mail: marica.biagini@lnf.infn.it
Published online: 9 June 2014
A τ/charm Factory, an e + e- collider with very high luminosity at the 2–4.6 GeV center of mass energy, to be built on the Rome University at Tor Vergata campus, was studied by the Consortium Nicola Cabibbo Laboratory and the INFN Frascati Laboratories. This project is the natural evolution of the flagship Italian project SuperB Factory, funded by the Italian Government in 2010 with a budget that turned out to be insufficient to cover the total costs of the project. The study of rare events at the τ/charm energy was already planned as a Phase-II of SuperB [1]. This design keeps all the unique features of SuperB, including the polarization of the electron beam, with the possibility to take data in a larger energy range, with reduced accelerator dimensions and construction and operation costs. A Report on the accelerator design has been published in September 2013 [2].
© Owned by the authors, published by EDP Sciences, 2014
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.