Issue |
EPJ Web of Conferences
Volume 88, 2015
IWM-EC 2014 – International Workshop on Multi facets of EoS and Clustering
|
|
---|---|---|
Article Number | 00011 | |
Number of page(s) | 10 | |
DOI | https://doi.org/10.1051/epjconf/20158800011 | |
Published online | 24 April 2015 |
https://doi.org/10.1051/epjconf/20158800011
The SPES project of INFN: Facility and detectors
1 INFN-LNL, Laboratori Nazionali di Legnaro, I-35141, Legnaro (PD), Italy
2 INFN-LNS, Laboratori Nazionali del Sud, I-95123, Catania, Italy
Published online: 24 April 2015
The SPES Radioactive Ion Beam facility at INFN-LNL is presently in the construction phase. The facility is based on the Isol (Isotope separation on-line) method with an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is provided by a high current Cyclotron accelerator with energy of 35-70 MeV and a beam current of 0.2-0.5 mA. Neutron-rich radioactive ions are produced by proton induced Uranium fission at an expected fission rate of the order of 1013 fissions per second. After ionization and selection the exotic isotopes are re-accelerated by the ALPI superconducting Linac at energies of 10A MeV for masses in the region A = 130 amu. The expected secondary beam rates are of the order of 107 - 109 pps. Aim of the SPES project is to provide a facility for high intensity radioactive ion beams for nuclear physics research as well as to develop an interdisciplinary research center based on the cyclotron proton beam.
© Owned by the authors, published by EDP Sciences - SIF, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.