Issue |
EPJ Web of Conferences
Volume 93, 2015
CGS15 – Capture Gamma-Ray Spectroscopy and Related Topics
|
|
---|---|---|
Article Number | 02019 | |
Number of page(s) | 6 | |
Section | Nuclear Reactions | |
DOI | https://doi.org/10.1051/epjconf/20159302019 | |
Published online | 28 May 2015 |
https://doi.org/10.1051/epjconf/20159302019
Current and Future Research at DANCE
Los Alamos National Laboratory, Los Alamos, 87545, New Mexico, USA
a e-mail: mjandel@lanl.gov
Published online: 28 May 2015
An overview of the current experimental program on measurements of neutron capture and neutron induced fission at the Detector for Advanced Neutron Capture Experiments (DANCE) is presented. Three major projects are currently under way: 1) high precision measurements of neutron capture cross sections on Uranium isotopes, 2) research aimed at studies of the short-lived actinide isomer production in neutron capture on 235U and 3) measurements of correlated data of fission observables. New projects include developments of auxiliary detectors to improve the capability of DANCE. We are building a compact, segmented NEUtron detector Array at DANCE (NEUANCE), which will be installed in the central cavity of the DANCE array. It will provide experimental information on prompt fission neutrons in coincidence with the prompt fission gamma-rays measured by 160 BaF2 crystals of DANCE. Unique correlated data will be obtained for neutron capture and neutron-induced fission using the DANCE-NEUANCE experimental set up in the future.
© Owned by the authors, published by EDP Sciences, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.