Issue |
EPJ Web of Conferences
Volume 94, 2015
DYMAT 2015 - 11th International Conference on the Mechanical and Physical Behaviour of Materials under Dynamic Loading
|
|
---|---|---|
Article Number | 01029 | |
Number of page(s) | 5 | |
Section | Experimental Techniques | |
DOI | https://doi.org/10.1051/epjconf/20159401029 | |
Published online | 07 September 2015 |
https://doi.org/10.1051/epjconf/20159401029
A novel technique for performing symmetric Taylor impact
SMF Fracture and Shock Physics Group, Cavendish Laboratory, University of Cambridge, CB3 0HE, UK
a Corresponding author: smw14@cam.ac.uk
Published online: 7 September 2015
A novel spring tensioned wire cradle arrangement has been developed to hold the target rod lightly but firmly in place when performing rod-on-rod (symmetric Taylor) impact in a vacuum. In addition, a soft capture system has been designed and used to decelerate both rods while reducing the chance of them colliding a second time. High-speed photography was used to obtain the profile of a pure aluminium target rod as a function of time. Photon Doppler Velocimetry (PDV) was also deployed to record the velocity of the rear of the target rod as a function of time. Voiding in the interior of recovered rods was investigated non-destructively using X-ray tomography. The data provides comprehensive validation information for predictive constitutive models.
© Owned by the authors, published by EDP Sciences, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.