Issue |
EPJ Web of Conferences
Volume 118, 2016
International Workshop on “Flavour Changing and Conserving Processes” 2015 (FCCP 2015)
|
|
---|---|---|
Article Number | 01015 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/epjconf/201611801015 | |
Published online | 26 April 2016 |
https://doi.org/10.1051/epjconf/201611801015
Next Generation Muon g − 2 Experiments
Department of Physics, University of Washington, Seattle, WA, 98195, USA
a e-mail: hertzog@uw.edu
Published online: 26 April 2016
I report on the progress of two new muon anomalous magnetic moment experiments, which are in advanced design and construction phases. The goal of Fermilab E989 is to reduce the experimental uncertainty of aμ from Brookhaven E821 by a factor of 4; that is, δaμ ∼ 16 × 10−11, a relative uncertainty of 140 ppb. The method follows the same magic-momentum storage ring concept used at BNL, and pioneered previously at CERN, but muon beam preparation, storage ring internal hardware, field measuring equipment, and detector and electronics systems are all new or upgraded significantly. In contrast, J-PARC E34 will employ a novel approach based on injection of an ultra-cold, low-energy, muon beam injected into a small, but highly uniform magnet. Only a small magnetic focusing field is needed to maintain storage, which distinguishes it from CERN, BNL and Fermilab. E34 aims to roughly match the previous BNL precision in their Phase 1 installation.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.