Issue |
EPJ Web Conf.
Volume 153, 2017
ICRS-13 & RPSD-2016, 13th International Conference on Radiation Shielding & 19th Topical Meeting of the Radiation Protection and Shielding Division of the American Nuclear Society - 2016
|
|
---|---|---|
Article Number | 01018 | |
Number of page(s) | 4 | |
Section | 1. Nuclear Data, Radiation Detection, Measurements & Dosimetry | |
DOI | https://doi.org/10.1051/epjconf/201715301018 | |
Published online | 25 September 2017 |
https://doi.org/10.1051/epjconf/201715301018
Experimental approach to measure thick target neutron yields induced by heavy ions for shielding
Grand Accélérateur National d'Ions Lourds, Bd Henri Becquerel, 14076 Caen, France
* To whom all correspondence should be addressed: trinh@ganil.fr, fadil@ganil.fr and lewitowicz@ganil.fr
Published online: 25 September 2017
Double differential (angular and energy) neutron distributions were measured using an activation foil technique. Reactions were induced by impinging two low-energy heavy-ion beams accelerated with the GANIL CSS1 cyclotron: (36S (12 MeV/u) and 208Pb (6.25 MeV/u)) onto thick natCu targets. Results have been compared to Monte-Carlo calculations from two codes (PHITS and FLUKA) for the purpose of benchmarking radiation protection and shielding requirements. This comparison suggests a disagreement between calculations and experiment, particularly for high-energy neutrons.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.