Issue |
EPJ Web Conf.
Volume 174, 2018
4th International Conference on Micro Pattern Gaseous Detectors (MPGD 2015)
|
|
---|---|---|
Article Number | 01002 | |
Number of page(s) | 4 | |
Section | Applications | |
DOI | https://doi.org/10.1051/epjconf/201817401002 | |
Published online | 21 February 2018 |
https://doi.org/10.1051/epjconf/201817401002
Study of the dE/dx resolution of a GEM Readout Chamber prototype for the upgrade of the ALICE TPC
1
Physik Department E62, Technische Universität München, 85748 Garching, Germany
2
Excellence Cluster ’Origin and Structure of the Universe’, 85748 Garching, Germany
a e-mail: andreas.mathis@ph.tum.de
Published online: 21 February 2018
The ALICE Collaboration is planning a major upgrade of its central barrel detectors to be able to cope with the increased LHC luminosity beyond 2020. For the TPC, this implies a replacement of the currently used gated MWPCs (Multi-Wire Proportional Chamber) by GEM (Gas Electron Multiplier) based readout chambers. In order to prove, that the present particle identification capabilities via measurement of the specific energy loss are retained after the upgrade, a prototype of the ALICE IROC (Inner Readout Chamber) has been evaluated in a test beam campaign at the CERN PS. The dE/dx resolution of the prototype has been proven to be fully compatible with the current MWPCs.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.