Issue |
EPJ Web Conf.
Volume 182, 2018
6th International Conference on New Frontiers in Physics (ICNFP 2017)
|
|
---|---|---|
Article Number | 02037 | |
Number of page(s) | 14 | |
Section | Talks | |
DOI | https://doi.org/10.1051/epjconf/201818202037 | |
Published online | 03 August 2018 |
https://doi.org/10.1051/epjconf/201818202037
CMS trigger performance
University of Zurich
a e-mail: silvio.donato@cern.ch
Published online: 3 August 2018
During its second run of operation (Run 2), started in 2015, the LHC will deliver a peak instantaneous luminosity that may reach 2 · 1034 cm-2s-1 with an average pileup of about 55, far larger than the design value. Under these conditions, the online event selection is a very challenging task. In CMS, it is realized by a two-level trigger system: the Level-1 (L1) Trigger, implemented in custom-designed electronics, and the High Level Trigger (HLT), a streamlined version of the offine reconstruction software running on a computer farm. In order to face this challenge, the L1 trigger has been through a major upgrade compared to Run 1, whereby all electronic boards of the system have been replaced, allowing more sophisticated algorithms to be run online. Its last stage, the global trigger, is now able to perform complex selections and to compute high-level quantities, like invariant masses. Likewise, the algorithms that run in the HLT have been greatly improved; in particular, new approaches for the online track reconstruction lead to a drastic reduction of the computing time, and to much improved performances. This document will describe the performance of the upgraded trigger system in Run 2.
© The Authors, published by EDP Sciences 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.