Developments towards 1MW Gyrotron Test Facility at ITER-India
ITER-India, Institute for Plasma Research, Bhat, Gandhinagar - 382 428, Gujarat, India
* Corresponding author: vipal.rathod@iter-india.org
Published online: 25 March 2019
ITER-India, the Indian domestic agency for the ITER project, has the responsibility to supply a set of two high power Gyrotron sources (1 MW, 170 GHz, 3600 s) along with the auxiliary systems for Electron Cyclotron Heating & Current Drive applications. For such high power Gyrotron systems, one of the challenging areas is the system integration and establishment of reliable integrated system performance. ITER-India plans to establish the integrated Gyrotron system performance that essentially meets the ITER requirements in a Gyrotron Test Facility which is specifically being developed at ITER-India. This paper discusses about the recent updates towards the Test Facility development which includes, development of cost effective & modular Body Power Supply (BPS), Industrial grade prototype interlock & protection modules, a Gyrotron field simulator and cooling water distribution system.
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.