Issue |
EPJ Web Conf.
Volume 214, 2019
23rd International Conference on Computing in High Energy and Nuclear Physics (CHEP 2018)
|
|
---|---|---|
Article Number | 01042 | |
Number of page(s) | 8 | |
Section | T1 - Online computing | |
DOI | https://doi.org/10.1051/epjconf/201921401042 | |
Published online | 17 September 2019 |
https://doi.org/10.1051/epjconf/201921401042
New approaches for track reconstruction in LHCb’s Vertex Locator
1
Technical University Dortmund
Germany
2
École polytechnique fédérale de Lausanne
Switzerland
3
CERN
Switzerland
* e-mail: christoph.hasse@cern.ch
Published online: 17 September 2019
Starting with Upgrade 1 in 2021, LHCb will move to a purely software-based trigger system. Therefore, the new trigger strategy is to process events at the full rate of 30MHz. Given that the increase of CPU performance has slowed down in recent years, the predicted performance of the software trigger currently falls short of the necessary 30MHz throughput. To cope with this shortfall, the Upgrade High Level Trigger currently uses impact parameter cuts on VELO tracks to reduce the amount of tracks which require further processing. The presented work introduces an alternative approach to determine the impact parameter while achieving a more reliable uncertainty prediction than the current method, which could potentially improve the physics quality of these cuts at a later time.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.