Measurements with the stripping foil test stand in the Linac4 Transfer Line
CERN, CH-1211, Geneva 23, Switzerland
* Corresponding author: wim.weterings@cern.ch
Published online: 28 February 2020
In 2020, after the CERN accelerators complex Long Shutdown 2 (LS2), a novel Linac4 (L4)-to-PS Booster (PSB) charge-exchange injection system will allow to transform the L4 160 MeV H- beam into H+, which will be injected into the four PSB superposed rings. For this, a 200 µg/cm2 carbon stripping foil will convert negative hydrogen ions (H-) into protons by stripping off the electrons. L4 is now performing operational reliability runs, which include a stripping foil test stand installed in the L4 transfer line. These tests will permit to gain experience on the fragile foils, test different foil materials and thicknesses, measure the efficiency and lifetime of the foils, and evaluate the foil changing mechanism as well as the interlocking functions. This paper briefly describes the stripping foil test stand setup, before reporting on the obtained important test results.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.