Issue |
EPJ Web Conf.
Volume 246, 2020
Joint EPS-SIF International School on Energy. Course 5 – “Energy: Where we stand and where we go”
|
|
---|---|---|
Article Number | 00012 | |
Number of page(s) | 18 | |
DOI | https://doi.org/10.1051/epjconf/202024600012 | |
Published online | 16 December 2020 |
https://doi.org/10.1051/epjconf/202024600012
Realization of a new large research infrastructure in Belgium: MYRRHA contribution for closing the nuclear fuel cycle making nuclear energy sustainable
SCK CEN – Boeretang 200, B-2400 Mol, Belgium
UCLouvain, Ecole Polytechnique de Louvain Place du Levant 2, B-1348 Louvain-la-Neuve, Belgium
(*) E-mail: haitabde@sckcen.be
Published online: 16 December 2020
In order to provide an appropriate level of energy to the whole world, nuclear energy is still going to play an important role. Nuclear energy can help reducing the CO2 emissions, which today are excessive. The problematics of nuclear waste can be solved using long-term geological storage in deep suitable formations. Partitioning and transmutation can help reducing the radiotoxicity of spent fuel to more acceptable durations of time. The MYRRHA project investigates since more than 20 years the possibility to demonstrate transmutation at a reasonable power level. In this paper we present the current state of the MYRRHA reactor design and the associated research and development activities.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.