Issue |
EPJ Web Conf.
Volume 247, 2021
PHYSOR2020 – International Conference on Physics of Reactors: Transition to a Scalable Nuclear Future
|
|
---|---|---|
Article Number | 04013 | |
Number of page(s) | 8 | |
Section | Monte Carlo Transport | |
DOI | https://doi.org/10.1051/epjconf/202124704013 | |
Published online | 22 February 2021 |
https://doi.org/10.1051/epjconf/202124704013
GENERATING ALBEDO BOUNDARY CONDITIONS FOR NODAL DIFFUSION CODES USING SERPENT 2
1 VTT Technical Research Centre of Finland Ltd P.O. Box 1000, FI-02044 VTT, FINLAND
2 Fortum Power and Heat Ltd P.O. Box 100, FI-00048 FORTUM, FINLAND
ville.valtavirta@vtt.fi
jaakko.kuopanportti@fortum.com
antti.rintala@vtt.fi
Published online: 22 February 2021
We use the Serpent Monte Carlo code to produce total and partial albedo boundary conditions that can be used to model the Loviisa NPP VVER-440 core with the nodal neutronics tools of Fortum. The albedo generation process is described in detail. The dependence of the generated albedos on boron content and water density is investigated and a clear distinction is noted in water density dependence between regions containing mostly water and those containing mostly structural materials. The Serpent generated albedos are currently used in production calculations for modeling the Loviisa reactors at Fortum.
Key words: Serpent / albedo / nodal diffusion / boundary condition / Apros
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.