OVERVIEW OF THE HINKLEY POINT C EPR PROJECT ‘J0’ AND BEYOND
EDF NNB Gen Co, Bridgewater House, Counterslip, Bristol BS1 6BX, UK
Published online: 22 February 2021
The twin unit EPR construction at Hinkley Point C is the first nuclear new build project to be undertaken in the UK in a generation. Moreover, it is now the country’s only new reactor project still in progress. The station’s two 1650 MWe plants [1] will complement the UK’s decarbonisedm energy mix with addition of approximately 7% of the current national requirement. In 2019, less than three years from the final investment decision, the ‘J0’ milestone was reached. This represents the end of the preparatory works, including all the common raft nuclear island concrete for Unit 1, enabling the upwards erection of the reactor containment and other support buildings. In addition to this, important milestones such as launch of the first tunnel boring machine, to tunnel the Unit 1 sea-water intake pipe have all been achieved. Over the coming years, the project will need to evolve in order to meet the increasing complexity and multi-organisation scope, which will present a challenging delivery environment. In order to support this, a UK-based Design Authority works on review, verification and acceptance of the HPC design including its UK specificities. This allows NNB, as licensee, to own its design and prepare the pre-commissioning safety case and operational strategies, defensible to the relevant UK regulators. As an example, this paper presents the roles and responsibilities in the Reactor Technology Team. This small, flexible team is involved in technical oversight of all aspects of the fuel & core design, through normal operations, anticipated and design-basis faults, severe accidents and radiological consequence estimation.
Key words: EPR / PWR / new-build
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.