Simulation and reflectivity measurements of the ITER first plasma beam dump material
University of Stuttgart, Institute of Interfacial Process Engineering and Plasma Technology, Germany
* Corresponding author: andreas.hentrich@igvp.uni-stuttgart.de
Published online: 23 February 2023
When constructing a beam dump for a fusion device, one faces several challenges and constrictions: It must be vacuum compatible, resistant to temperatures and radiation, should neither gas out nor deteriorate, should take up as less space as possible and obviously also should absorb microwave radiation well. As possible candidates, the group of ceramic metal oxide layers have been suggested, from which three different material systems have been produced by atmospheric plasma spraying and investigated: Titanium oxide, chromium oxide and an aluminum-titanium oxide compound material. Both pure titanium oxide and chromium oxide don’t show the absorption necessary, but Al2O3/TiO2 (60/40) is very promising and will be presented in the following.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.