ECCD system design activities for JA DEMO
1 Setsunan University, Neyagawa, Osaka, Japan
2 Insitute of Advanced Energy, Kyoto University, Uji, Kyoto, Japan
3 Kyushu University, Kasuga, Fukuoka, Japan
4 Tohoku University, Sendai, Miyagi, Japan
5 National Institute for Quantum Science and Technology, Naka, Ibaraki, Japan
6 Chubu University, Kasugai, Aichi, Japan
7 National Institute for Quantum Science and Technology, Rokkasho, Aomori, Japan
* Corresponding author: yasuhisa.oda@mec.setsunan.ac.jp
Published online: 15 November 2024
ECCD system design activities for JA DEMO is in progress. Activities contains physical analysis, launcher design, and RF power plant design. The physical analysis activity explores various approaches to enhance ECCD efficiency. The RF power plant design activity produced a conceptual design of a 100 MW class RF power plant. The launcher design activity presented the upper and equatorial launcher port of the JA DEMO tokamak vacuum vessel and analyzed the ECCD operation of each launcher. The result is the achievement of RF power deposition at the core of plasma for ECCD by selecting the proper injection angle and frequency.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.