Open Access
Issue
EPJ Web Conf.
Volume 203, 2019
20th Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Resonance Heating (EC20)
Article Number 04001
Number of page(s) 8
Section Technology
DOI https://doi.org/10.1051/epjconf/201920304001
Published online 25 March 2019
  1. M. Henderson, “Status of the ITER EC system,” presented at US/EU/JA Workshop on RF Heating Tech., Santa Monica, CA, USA, Sep. 4-7, 2017. [Google Scholar]
  2. K. Takahashi et al., “Development of ITER gyrotrons and equatorial launcher,” presented at US/EU/JA Workshop on RF Heating Tech., Santa Monica, CA, USA, Sep. 4-7, 2017. [Google Scholar]
  3. T. Goodman et al., “FALCON test facility,” presented at US/EU/JA Workshop on RF Heating Tech., Santa Monica, CA, USA, Sep. 4-7, 2017. [Google Scholar]
  4. J.P. Anderson et al., “Heating effects in overmoded corrugated waveguide for ITER,” J. Infr. MMW-THz Waves, 37, 1, 2016. [Google Scholar]
  5. G. Hanson, “ITER ECH transmission line system update,” presented at US ECH Tech. Community Meeting, San Diego, USA, Feb. 6, 2017. [Google Scholar]
  6. J. Lohr et al., “Performance history and upgrades for the DIII-D gyrotron complex,” presented at US ECH Tech. Community Meeting, Oak Ridge, TN, USA, May 8, 2014. [Google Scholar]
  7. J.P. Anderson, et al., “High power testing of water-cooled waveguide for ITER-like ECH transmission lines,” Nucl. Fusion, 57, 5, 2017. [Google Scholar]
  8. W. Bin et al., “Status of the high power matched load activity at IFP-CNR,” presented at US/EU/JA Workshop on RF Heating Tech., Santa Monica, CA, USA, Sep. 4-7, 2017. [Google Scholar]
  9. M. Joung et al., “KSTAR ECH status and plan for high performance and steady-state operation,” presented at 22nd Conf. on RF Power in Plasmas, Aix-en-Provence, France, May 30 – June 2, 2017. [Google Scholar]
  10. W.H. Safranek, Properties of Electrodeposited Metals and Alloys, 2nd Ed., Amer. Electroplaters Soc., Dec. 1986. [Google Scholar]
  11. T. Kobayashi et al., “Progress in ECRF system development and preparation for JT-60SA,” presented at US/EU/JA Workshop on RF Tech., Santa Monica, CA, USA, Sep. 4-7, 2017. [Google Scholar]
  12. M. Saigusa et al., “Thermal analysis and ohmic loss estimation of polarizer for ITER ECCD system,” Fusion Eng. Des., 74, 2005. [Google Scholar]
  13. J. Doane, H. Grunloh, W. Martin, and W. Wu, Fusion Eng. and Design, 102, 2016, pp. 99-107. [Google Scholar]
  14. S. Jawla et al., “MIT program update,” presented at ECH Tech. Community Meeting, San Diego, USA, Feb. 6, 2017. [Google Scholar]
  15. J.L. Doane, “Tests of compact dummy loads designed for 1 MW CW,” Proc. Of the 12th Joint Workshop on ECE and ECH, Aix-en-Provence, France, 13-16 May 2002, World Scientific, 2003. [Google Scholar]
  16. J. Lohr et al., “Operating a multiple gyrotron system,” presented at US/EU/JA Workshop on RF Heating Tech., Sedona, AZ, USA, Sep. 22-24, 2014. [Google Scholar]
  17. J. Doane, et al., “Power monitor miter bends for high-power microwave transmission,” Fusion Eng. And Design, 93, 2015. [CrossRef] [Google Scholar]
  18. C. Moeller et al., “Status of mode-selective ECH miter bend power monitor,” presented at US/EU/JA Workshop on RF Heating Tech., Santa Monica, CA, USA, Sep. 4-7, 2017. [Google Scholar]
  19. www.swissto12.com [Google Scholar]
  20. T. Horn et al., “Additively manufactured WR-10 copper waveguide,” presented at Int’l Vacuum Elect. Conf. (IVEC), Monterey, CA, USA, April 24-26, 2018. [Google Scholar]
  21. J.P. Anderson et al., “Additive manufacturing techniques for millimetre-wave components,” presented at 41st Int’l. Conf. on Infrared, Millimeter and THz Waves, Copenhagen, Sep. 25-30, 2016. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.