Open Access
Issue |
EPJ Web Conf.
Volume 315, 2024
International Workshop on Future Linear Colliders (LCWS2024)
|
|
---|---|---|
Article Number | 02007 | |
Number of page(s) | 9 | |
Section | Accelerator | |
DOI | https://doi.org/10.1051/epjconf/202431502007 | |
Published online | 18 December 2024 |
- M. Aicheler et al., “A Multi-TeV linear collider based on CLIC technology: CLIC Conceptual Design Report”, CERN, Geneva, Switzerland, CERN-2012-007, 2012. [Google Scholar]
- N. Catalan-Lasheras et al., “Commissioning of XBox-3: A Very High Capacity X-band Test Stand”, in Proc. LINAC’16, East Lansing, MI, USA, Sep. 2016, pp. 568–571. doi:10.18429/JACoW-LINAC2016-TUPLR047 [Google Scholar]
- X. W. Wu et al., “High-Gradient Breakdown Studies of an X-Band Accelerating Structure Operated in the Reversed Taper Direction”, in Proc. IPAC’21, Campinas, Brazil, May 2021, pp. 1543–1546. doi:10.18429/JACoW-IPAC2021-TUPAB076 [Google Scholar]
- M. Volpi et al., “The Southern Hemisphere’s First X-Band Radio-Frequency Test Facility at the University of Melbourne”, in Proc. IPAC’21, Campinas, Brazil, May 2021, pp. 3588–3591. doi:10.18429/JACoW-IPAC2021-WEPAB374 [Google Scholar]
- M. Volpi. et al., “Commissioning of X-LAB: a very high-capacity X-band RF test stand facility at the University of Melbourne”, in Proc. IPAC’23, Venice, Italy, 7-12 May 2023, pp.072001. http://dx.doi.org/10.18429/JACoW-IPAC2023-THOGA1 [Google Scholar]
- B. Woolley “ High power X-band RF test stand development and high power testing of the CLIC crab cavity., Lancaster University, 2015. 173 p. [Google Scholar]
- Z. D. Farkas et al., “SLED: A method of doubling SLAC’s energy”, in Proc. 9th Int. Conf. On High Energy Accelerators, SLAC, CA, USA, 1974, pp. 576–583. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.