Open Access
Issue
EPJ Web Conf.
Volume 346, 2026
25th Topical Conference on Radio-Frequency Power in Plasmas (RFPPC2025)
Article Number 03016
Number of page(s) 8
Section Radio-Frequency and Microwave Diagnostics and Technology
DOI https://doi.org/10.1051/epjconf/202634603016
Published online 07 January 2026
  1. W. Helou et al. “The ITER ICRF system under the new ITER baseline: latest updates and technological developments”. 25th Topical Conference on Radio-Frequency Power in Plasmas, Schloss Hohenkammer, Germany, May 19-22 (2025). https://www.ipp.mpg.de/5534018 [Google Scholar]
  2. J. M. Bernard et al., New High Power CW Test Facilities For ITER ICRH Components Testing, AIP Conf. Proc. 1406, 49 (2011). https://doi.org/10.1063/1.3664926 [Google Scholar]
  3. J. M. Bernard et al., New high power CW test facilities for ITER ICRH components testing, Fusion Eng. Des. 86, 876 (2011). https://doi.org/10.1016/j.fusengdes.2011.02.100 [Google Scholar]
  4. A. Argouarch et al., RF contact development for the ITER ICRH antenna, AIP Conf. Proc. 1580, 374 (2014). https://doi.org/10.1063/1.4864566 [Google Scholar]
  5. J. Hillairet et al., R&D activities on RF contacts for the ITER ion cyclotron resonance heating launcher, Fusion Eng. Des. 96-97, 477 (2015). https://doi.org/10.1016/j.fusengdes.2015.04.005 [Google Scholar]
  6. J. Hillairet et al., Radiofrequency and mechanical tests of silver coated CuCrZr contacts for the ITER ion cyclotron antenna, Fusion Eng. Des. 129, 29 (2018). https://doi.org/10.1016/j.fusengdes.2018.02.047 [Google Scholar]
  7. https://github.com/jhillairet/tresonator [Google Scholar]
  8. E. Al Hajj Sleiman et al., Evaluation of multipactor thresholds for coaxial lines subject to surface conditioning for the WEST ion cyclotron antenna, Fusion Eng. Des. 185, 113325 (2022). https://doi.org/10.1016/j.fusengdes.2022.113325 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.