Issue |
EPJ Web of Conferences
Volume 66, 2014
INPC 2013 – International Nuclear Physics Conference
|
|
---|---|---|
Article Number | 11029 | |
Number of page(s) | 4 | |
Section | New Facilities and Instrumentation | |
DOI | https://doi.org/10.1051/epjconf/20146611029 | |
Published online | 20 March 2014 |
https://doi.org/10.1051/epjconf/20146611029
The transfer RIB lines to the DESIR facility at GANIL-SPIRAL2
CNRS-IN2P3, Université Paris Sud, IPNO, 91406 Orsay, France
a e-mail: perrot@ipno.in2p3.fr
Published online: 20 March 2014
The new ISOL facility SPIRAL2 is currently being built at GANIL, Caen France. SPIRAL2 will produce a large number of new radioactive ion beams (RIB) at high intensities. The DESIR facility will receive beams from the upgraded SPIRAL1 facility of GANIL (stable beam and target fragmentation), from the S3 Low Energy Branch (fusion-evaporation and deep-inelastic reactions) and from the SPIRAL2 production cave (n-induced fission of 238U, nucleon transfer and fusion-evaporation reactions). In order to deliver the RIB to the experimental set-ups installed in the DESIR hall, 110 meters of beam line have to be designed, originating from 3 different facilities. This paper will focus on the studies which have been done on these transfer lines: beam optics and errors calculations, quadrupoles, diagnostics and mechanical designs.
© Owned by the authors, published by EDP Sciences, 2014
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 2.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.