Issue |
EPJ Web of Conferences
Volume 68, 2014
ICASCE 2013 – International Conference on Advances Science and Contemporary Engineering
|
|
---|---|---|
Article Number | 00009 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/epjconf/20146800009 | |
Published online | 28 March 2014 |
https://doi.org/10.1051/epjconf/20146800009
Improvement of Stand Jig Sealer and Its Increased Production Capacity
Bina Nusantara University, Industrial Engineering Department, Syahdan Campus, JL. K.H. Syahdan No. 9, Palmerah, Jakarta Barat 11480 Indonesia
Published online: 28 March 2014
This paper has the objective to prove that improvement of Stand Jig Sealer can lead to the cycle time target as part of Improvement efforts and its Productivity. Prior researches through prior journals both classics journal such as Quesnay (1766) and Solow (1957) and updated journal such as Reikard (2011) researches, are mentioned and elaborated. Precisely, the research is narrowed down and specified into automotive industry and eventually the software related of SPSS and Structural Equation Modeling ( SEM ). The analysis and its method are conducted through the calculation working time. The mentioned calculation are reinforced with the hypothesis test using SPSS Version 19 and involve parameters of production efficiency, productivity calculation, and the calculation of financial investments. The results obtained are augmented achievement of cycle time target ≤ 80 seconds posterior to improvement stand jig sealer. The result from calculation of SPSS-19 version comprise the following aspects: the one-sided hypothesis test is rejection of Ho:μ≥80 seconds, the correlation rs=0.84, regression y = 0.159+0.642x, validity R table = 0.4438, reliability value of Cronbach’s alpha = 0.885>0.70, independence (Chi Square) Asymp. Sig=0.028<0.05, 95% efficiency, increase productivity 11%, financial analysis (NPV 2,340,596>0, PI 2.04>1, IRR 45.56%>i=12.68%, PP=1.86). The Mentioned calculation results support the hypothesis and ultimately align with the objective of this paper to prove that improvement of Stand Jig Sealer and its relation toward the cycle time target. Precisely, the improvement of production capacity of PT. Astra Daihatsu Motor.
© Owned by the authors, published by EDP Sciences, 2014
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 2.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.