Open Access
Issue
EPJ Web of Conferences
Volume 68, 2014
ICASCE 2013 – International Conference on Advances Science and Contemporary Engineering
Article Number 00009
Number of page(s) 8
DOI https://doi.org/10.1051/epjconf/20146800009
Published online 28 March 2014
  1. Allender, M.C. (1984). Productivity Enhancement: A New Teamwork Approach. John Wiley & Sons, New York, NY, U.S.A. [Google Scholar]
  2. Asian Productivity Organization. (2006). Handbook on Green Productivity. Available from: http://www.apo-tokyo.org/gp/e_publi/ebooks_gp/APO_Handbook_on_Productivity.pdf. Accessed date: Oct 16, 2008 [Google Scholar]
  3. Asian Productivity Organization. (2007). Productivity measurement. APO News, Tokyo, Japan, 37(5):1–8. [Google Scholar]
  4. Barocci, T.A., and Wever, K.R. (1982). Productivity, industrial relations and human resource management: football on a soccer field. Works Paper, Sloan School of Management, Massachusetts Institute of Technology, Cambridge, Mass., USA. [Google Scholar]
  5. Batra, V.K., Kumar, K., Chhangani, P.N., and Parihar, P.S. (2009). Plant Operations and Productivity Enhancement - a Case Study. Available from: http://www.holtecnet.com/web/content/references/TechnicalPapers/p_2004_5.pdf. Accessed date: Jun 4, 2009. [Google Scholar]
  6. Black, S.E., and Lynch, L.M. (1996). Human capital investments and productivity. The American Economics Review, 86 (2), p. 263–267. [Google Scholar]
  7. Beck, M. (2009). Protect your Attitude. Available from: http://www.xleaders.com/articles Protect Your Attitude.pdf. Accessed date: Jun 3, 2009. [Google Scholar]
  8. Bell, C.R. (1988). Human Resources and Labour Relations. American Management Association, Managing Solutions. [Google Scholar]
  9. Chinda, T. (2010). Structural equation modeling of productivity enhancement. Journal of Science Technology , 17(3), p. 259–276. [Google Scholar]
  10. Cosmetatos, G.P. and Eilon, S. (1983). Effects of productivity definition and measurement on Performance evaluation. European Journal of Operations Research, 14(1), p.31–35 [CrossRef] [Google Scholar]
  11. Dessler, G. (2005). Human Resource Management. 10th ed. Pearson EducationInc., Upper Saddle River, NJ, USA. [Google Scholar]
  12. Fournier, X., Agard, B. (2007). Improvement of earliness and lateness by postponement on an automotive production line. International Journal of Flexible Manufacturing Systems, 19, p. 107–121 [CrossRef] [Google Scholar]
  13. Haynes, R.M. and Duvall, P.K. (1992). Service quality management: a process-control approach. Int. J. Serv. Ind. Manag., 3(1):14–24. [CrossRef] [Google Scholar]
  14. Hoffman, J.M. and Mehra, S. (1999). Management leadership and productivity improvement programs. International Journal of Applied Quality Management, 2 (2), p.221–232. [CrossRef] [Google Scholar]
  15. Hussain, M.R. (2008). Striving for Organizational Excellence through Productivity Enhancement. PSMB 2008 Conference, Malaysia Productivity Corporation. Available from:http://www.hrdnet.com.my/imejconf2008/5Striving.pdf. Accessed date: Jun 3, 2009. [Google Scholar]
  16. Imai, M. (1999). Gemba Kaizen : Pendekatan Akal Sehat, Berbiaya Rendah Pada Manajemen. PT. Pustaka Binaman Pressindo : Jakarta [Google Scholar]
  17. Johan, S. (2011). Studi Kelayakan Pengembangan Bisnis. Graha Ilmu : Yogyakarta [Google Scholar]
  18. Jorgenson, D.W. and Griliches, Z. (1967). The explanation of productivity change. Review of Economics Studies, Vol. 34, No. 3, p.249–283. [Google Scholar]
  19. Kilic, H. and Okumus, F. (2005). Factors influencing productivity in small island hotels: evidence from Northern Cyprus. International Journal of Contemporary Hospitality Management, 17(4):315–331. [CrossRef] [Google Scholar]
  20. Loke, C.F. (2001). Leadership behaviours: effects on job satisfaction, productivity, and organizational commitment. Journal of Nursing Management, 9(4):191–204. [CrossRef] [PubMed] [Google Scholar]
  21. Lubbe, B. (2000). Tourism Distribution: Managing the Travel Intermediary. Juta & Company Limited, Cape Town, South Africa. [Google Scholar]
  22. Marsidi, A. (2009). Improving Productivity through People. Malaysian Institute of Management. Available from: http://mgv.mim.edu.my/MMR/8412/841203.htm. Accessed date: Jun 3, 2009. [Google Scholar]
  23. Mcinnes, J.M (1984). Corporate Management of Productivity- An Empirical Study. Strategic Management Journal, 5, p. 351–365 [CrossRef] [Google Scholar]
  24. Millea, M. and Fuess, S.M. (2005). Does pay affect productivity or react to it? Examination of U.S. manufacturing. Q. Review of Economics Finance, 45, p.796–807. [Google Scholar]
  25. Miltenburg J (1989) Level schedules for mixed-model assembly lines in just-in-time production systems. Manage Sci 35, p.192–207 [CrossRef] [Google Scholar]
  26. Peter, E., Matta, R., and Boe, W. (2007). Shortterm work scheduling with job assignment flexibility for a multi-fleet transport system. Eur. J. Oper. Res., 280(1):82–98. [CrossRef] [Google Scholar]
  27. Prastito, A. (2004). Cara Mudah Mengatasi Masalah Statistik dan Rancangan Percobaan dengan SPSS 12. PT. Elex Media Komputindo : Jakarta [Google Scholar]
  28. Pritchard, R.D. (1995). Productivity Measurement and Improvement: Organizational Case Studies. Greenwood Publishing Group, Westport, CT, USA. [Google Scholar]
  29. Quesnay, F. (1766). Analyze de la formule arithmetique du tableau economique de la distribution des depenses annuelles d’une nation agricole. Journal de l’Agriculture, du Commerce & des Finances, p. 11–41. [Google Scholar]
  30. Reikard, G. (2011). Total factor productivity and R&D in the production function. International Journal of Innovation and Technology Management. 8 (4), p. 601–613. [CrossRef] [Google Scholar]
  31. Savery, L.K. (1998). Management and productivity increases. Journal of Management Development, 17(1):68–74. [CrossRef] [Google Scholar]
  32. Solow, R. M. (1969). “Investment and technical change,” in Arrow, K. J. (ed.), Mathematical Models in the Social Sciences, Palo Alto, CA: Stanford University Press. [Google Scholar]
  33. Tangen, S.(2005). Demystifying productivity and performance. International Journal of Productivity and Performance Management, 54 (1), p. 34–46. [CrossRef] [Google Scholar]
  34. Thailand Productivity Institute. (2008a). Inventory and Human Resource Management. Available from:http://www.ftpi.or.th/LinkClick.aspx?fileticket=capPRV81GyQ%3d&tabid=96&mid=656. Accessed date: Jun 3, 2009. [Google Scholar]
  35. Thailand Productivity Institute. (2008b). Quality Control System. Available from: http://www.ftpi.or.th/LinkClick.aspx?fileticket=AbV7AB00kAw%3d&tabid=96&mid=656. Accessed date: Jun 3, 2009. [Google Scholar]
  36. Thailand Productivity Institute. (2008c). Setup Time Reduction. Available from: http://www.ftpi.or.th/LinkClick.aspx?fileticket=qCRA1dzh0Xo%3d&tabid=96&mid=656. Accessed date: Jun 3, 2009. [Google Scholar]
  37. Relgolook. (2009). Productivity Enhancement Solution for Effective Email Management. Available from: http://www.articlebase.com/management-rticles/relgolookproductivity-enhancement-solution-foreffective-email-management-800221.html. Accessed date: Jun 4, 2009. [Google Scholar]
  38. Sales Creators. (2009). Better Workplace. Available from:http://www.Salescreators.com/Section4/betterWkPlace.html. Accessed date: Jun 3, 2009. [Google Scholar]
  39. Siu, O., Phillips, D.R., and Leung, T. (2004).Safety climate and safety performance among construction workers in Hong Kong: the role of psychological strains as mediators. Accident Anal. Prev., 36:359–366. [CrossRef] [Google Scholar]
  40. Sutalaksana,I.,Anggawisastra, R.,Tjakraatmadja, J. (2000). Teknik Tata Cara Kerja. Institut Teknologi Bandung : Bandung. [Google Scholar]
  41. Swierczek, F.W. and Shrestha, P.K. (2003). Information technology and productivity: a comparison of Japanese and Asia-Pacific banks. The Journal of High Technology Management Research, 14(2):269–288. [CrossRef] [Google Scholar]
  42. Umar, H. (2009). Studi Kelayakan Bisnis. Gramedia Pustaka Utama : Jakarta. [Google Scholar]
  43. Uyanto, S. (2009). Pedoman Analisis Data Dengan SPSS. Graha Ilmu : Yogyakarta [Google Scholar]
  44. Wignjosoebroto, S. (2008). Ergonomi : Studi Gerak dan Waktu. Institut Teknologi Sepuluh Nopember : Surabaya. [Google Scholar]
  45. Wignjosoebroto, S. (2006). Pengantar Teknik & Manajemen Industri. Institut Teknologi Sepuluh Nopember : Surabaya. [Google Scholar]
  46. Womack J, Jones D, Roos D (1991) The machine that changed the World: the story of lean production. Harper Perennial, New York, NY [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.