Issue |
EPJ Web of Conferences
Volume 100, 2015
Theoretical and Experimental Studies in Nuclear Applications and Technology (TESNAT 2015)
|
|
---|---|---|
Article Number | 04003 | |
Number of page(s) | 3 | |
Section | Nuclear Applications | |
DOI | https://doi.org/10.1051/epjconf/201510004003 | |
Published online | 09 July 2015 |
https://doi.org/10.1051/epjconf/201510004003
Parameters affecting of Akkuyu’s safety assessment for severe core damages
1 Celal Bayar University, Faculty of Art and Science, Department of Physics, 45030, Manisa, Turkey
2 Akdeniz University, Faculty of Science, Department of Physics, 07058, Antalya, Turkey
3 Akdeniz University, Faculty of Science, Department of Space Science and Technologies, Antalya, Turkey
a Corresponding author: yusufkavun@gmail.com
Published online: 9 July 2015
We have looked at all past core meltdowns (Three Mile Island, Chernobyl and Fukushima incidents) and postulated the fourth one might be taking place in the future most probably in a newly built reactors anywhere of the earth in any type of NPP. The probability of this observation is high considering the nature of the machine and human interaction. Operation experience is a very significant parameter as well as the safety culture of the host nation. The concerns is not just a lack of experience with industry with the new comers, but also the infrastructure and established institutions who will be dealing with the Emergencies. Lack of trained and educated Emergency Response Organizations (ERO) is a major concern. The culture on simple fire drills even makes the difference when a severe condition occurs in the industry. The study assumes the fourth event will be taking place at the Akkuyu NGS and works backwards as required by the “what went wrong ” scenarios and comes up with interesting results. The differences studied in depth to determine the impact to the severe accidents. The all four design have now core catchers. We have looked at the operator errors’like in TMI); Operator errors combined with design deficiencies(like in Chernobyl) and natural disasters( like in Fukushima) and found operator errors to be more probable event on the Akkuyu’s postulated next incident. With respect to experiences of the operators we do not have any data except for long and successful operating history of the Soviet design reactors up until the Chernobyl incident. Since the Akkuyu will be built, own and operated by the Russians we have found no alarming concerns at the moment. At the moment, there is no body be able to operate those units in Turkey. Turkey is planning to build the required manpower during the transition period. The resolution of the observed parameters lies to work and educate, train of the host nation and exercise together.
© Owned by the authors, published by EDP Sciences, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.