Issue |
EPJ Web Conf.
Volume 153, 2017
ICRS-13 & RPSD-2016, 13th International Conference on Radiation Shielding & 19th Topical Meeting of the Radiation Protection and Shielding Division of the American Nuclear Society - 2016
|
|
---|---|---|
Article Number | 02002 | |
Number of page(s) | 3 | |
Section | 2. Shielding Experiments & Benchmarks | |
DOI | https://doi.org/10.1051/epjconf/201715302002 | |
Published online | 25 September 2017 |
https://doi.org/10.1051/epjconf/201715302002
Characteristic Analysis of Concrete for Radiation Shielding Evaluation of Gamma Irradiation Facilities
KARA, Quality Assurance Center for Medical Radiation, 04790 77 Seongsuil-ro Seongdong-gu Seoul, Korea
a Corresponding author: hkjang@ri.or.kr
Published online: 25 September 2017
Physical and chemical properties of concrete sample was obtained using various methods such as density analysis, elemental analysis and WD-XRF analysis to get accurate characteristics of concrete collected in our construction site in Korea. Using these results, in this study, we perform the simulation to compare the dose evaluation results between NBS concrete of ANSI/ANS 6.4.3 and characteristics of concrete samples using MCNPX. As a result, simulation results of collected concrete samples in our facility were underestimated up to 54.01%. Through these results, we verify the necessity of accurate properties of materials.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.