Issue |
EPJ Web Conf.
Volume 203, 2019
20th Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Resonance Heating (EC20)
|
|
---|---|---|
Article Number | 04019 | |
Number of page(s) | 5 | |
Section | Technology | |
DOI | https://doi.org/10.1051/epjconf/201920304019 | |
Published online | 25 March 2019 |
https://doi.org/10.1051/epjconf/201920304019
Study on the soft-start process of PSM high voltage power supply for ECRH
1
Hefei Institutes of Physical Science, Chinese Academy of Sciences, Hefei 230031, China
2
University of Science and Technology of China, Hefei 230026, China
* Corresponding author: yyhuang@ipp.ac.cn
Published online: 25 March 2019
The soft-start process of high voltage power supply (HVPS) based on pulse step modulation (PSM) for ECRH on EAST is introduced, which is the first procedure of system operation. The response process is detailed by proposing DC equivalent circuit model, process analysis and performance comparison is given under the conditions of different soft-start resistor parameters, and the theoretical analysis is proved by the simulation package ANSYS Simplorer simulations. The soft-start resistor is designed for the HVPS of 140GHz ECRH system for a smooth charging without overshoot of the capacitor[6], and the final experimental results show that it is in agreement with the theoretical analysis and is stable and reliable to the power devices.
Key words: EAST / ECRH / pulse step modulation (PSM) / soft-start
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.