Issue |
EPJ Web Conf.
Volume 239, 2020
ND 2019: International Conference on Nuclear Data for Science and Technology
|
|
---|---|---|
Article Number | 06004 | |
Number of page(s) | 4 | |
Section | Spallation, High and Intermediate Energy Reactions | |
DOI | https://doi.org/10.1051/epjconf/202023906004 | |
Published online | 30 September 2020 |
https://doi.org/10.1051/epjconf/202023906004
Measurement of nuclide production cross section for lead and bismuth with proton in energy range from 0.4 GeV to 3.0 GeV
J-PARC/JAEA, 2-4, Shirakata, Tokai-mura, Ibaraki-ken, Japan
* e-mail: matsuda.hiroki@jaea.go.jp
Published online: 30 September 2020
For the Accelerator-Driven nuclear transmutation System (ADS), nuclide production yield estimation in a lead-bismuth target is important to manage the target. However, experimental data of nuclide production yield by spallation and high-energy fission reactions are scarce. In order to obtain the experimental data, an experiment in J-PARC using natPb and 209Bi samples were carried out. The samples were thin foils with about 0.1 mm thick and 25 mm × 25 mm square and were irradiated with protons at kinematic energy points of 0.4GeV, 2.2GeV, and 3.0 GeV. After the irradiation, the nuclide production cross section was determined by spectroscopic measurement of decay gamma-rays from the samples with HPGe detectors. In this paper, 14 nuclide production cross sections for lead and bismuth were obtained. They were compared with the calculated cross sections with various models and the evaluated one.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.