Issue |
EPJ Web Conf.
Volume 251, 2021
25th International Conference on Computing in High Energy and Nuclear Physics (CHEP 2021)
|
|
---|---|---|
Article Number | 02069 | |
Number of page(s) | 10 | |
Section | Distributed Computing, Data Management and Facilities | |
DOI | https://doi.org/10.1051/epjconf/202125102069 | |
Published online | 23 August 2021 |
https://doi.org/10.1051/epjconf/202125102069
Finalizing Construction of a New Data Center at BNL
Brookhaven National Laboratory, Upton, NY 11973-5000, U.S.A.
* Corresponding author: alezayt@bnl.gov
Published online: 23 August 2021
Computational science, data management and analysis have been key factors in the success of Brookhaven National Laboratory’s scientific programs at the Relativistic Heavy Ion Collider (RHIC), the National Synchrotron Light Source II (NSLS-II), the Center for Functional Nanomaterials (CFN), and in biological, atmospheric, and energy systems science, Lattice Quantum Chromodynamics (LQCD) and Materials Science, as well as our participation in international research collaborations, such as the ATLAS experiment at Europe’s Large Hadron Collider (LHC) at CERN (Switzerland) and the Belle II experiment at KEK (Japan). The construction of a new data center is an acknowledgement of the increasing demand for computing and storage services at BNL in the near term and enable the Lab to address the needs of the future experiments at the High-Luminosity LHC at CERN and the Electron-Ion Collider (EIC) at BNL in the long term.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.