The Phase-2 Upgrade of the CMS Data Acquisition
1 CERN, Geneva, Switzerland
2 University of California, San Diego, San Diego, California, USA
3 FNAL, Chicago, Illinois, USA
4 Massachusetts Institute of Technology, Cambridge, Massachusetts, USA
5 Technical University of Athens, Athens, Greece
6 Rice University, Houston, Texas, USA
7 American University of Beirut, Beirut, Lebanon
8 Also at Vilnius University, Vilnius, Lithuania
9 Also at CERN, Geneva, Switzerland
10 Also at Karlsruhe Institute of Technology, Karlsruhe, Germany
11 Now at Zurich Instruments, Zurich, Switzerland
* corresponding author - e-mail: emilio.meschi@cern.ch
Published online: 23 August 2021
The High Luminosity LHC (HL-LHC) will start operating in 2027 after the third Long Shutdown (LS3), and is designed to provide an ultimate instantaneous luminosity of 7:5 × 1034 cm−2 s−1, at the price of extreme pileup of up to 200 interactions per crossing. The number of overlapping interactions in HL-LHC collisions, their density, and the resulting intense radiation environment, warrant an almost complete upgrade of the CMS detector. The upgraded CMS detector will be read out by approximately fifty thousand highspeed front-end optical links at an unprecedented data rate of up to 80 Tb/s, for an average expected total event size of approximately 8 − 10 MB. Following the present established design, the CMS trigger and data acquisition system will continue to feature two trigger levels, with only one synchronous hardware-based Level-1 Trigger (L1), consisting of custom electronic boards and operating on dedicated data streams, and a second level, the High Level Trigger (HLT), using software algorithms running asynchronously on standard processors and making use of the full detector data to select events for offline storage and analysis. The upgraded CMS data acquisition system will collect data fragments for Level-1 accepted events from the detector back-end modules at a rate up to 750 kHz, aggregate fragments corresponding to individual Level- 1 accepts into events, and distribute them to the HLT processors where they will be filtered further. Events accepted by the HLT will be stored permanently at a rate of up to 7.5 kHz. This paper describes the baseline design of the DAQ and HLT systems for the Phase-2 of CMS.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.