Issue |
EPJ Web of Conf.
Volume 294, 2024
WONDER-2023 - 6th International Workshop On Nuclear Data Evaluation for Reactor applications
|
|
---|---|---|
Article Number | 06004 | |
Number of page(s) | 7 | |
Section | Processing and Benchmarking | |
DOI | https://doi.org/10.1051/epjconf/202429406004 | |
Published online | 17 April 2024 |
https://doi.org/10.1051/epjconf/202429406004
Improvements on the damage calculations using evaluated nuclear data and NJOY
1 Sino-French Institute of Nuclear Engineering and Technology, Sun Yat-sen University, Zhuhai 519082, China
2 CEA, DES, IRESNE, DER, SPRC, LEPh, F-13108 Saint-Paul-Lez-Durance, France
* Corresponding author: chenshli23@mail.sysu.edu.cn
Published online: 17 April 2024
NJOY is the only open-source nuclear data processing code allowing calculating neutron-induced displacement damage cross sections from evaluated nuclear data. However, some issues exist in the NJOY calculation of damage cross sections, including the inconsistency for neutron capture reaction with photon data given in MF6 vs. MF12-MF15, questionable or even incorrect recoil nuclear data in MF6, discrepant damage cross sections using different approaches, and the potential underestimation above 20 MeV due to the storage of nuclear data in MT5. These issues should be addressed by the improvements on both evaluated nuclear data and the NJOY code.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.