Issue |
EPJ Web Conf.
Volume 315, 2024
International Workshop on Future Linear Colliders (LCWS2024)
|
|
---|---|---|
Article Number | 01001 | |
Number of page(s) | 9 | |
Section | Physics | |
DOI | https://doi.org/10.1051/epjconf/202431501001 | |
Published online | 18 December 2024 |
https://doi.org/10.1051/epjconf/202431501001
Physics case for an e+e− collider at 500 GeV and above
1 Physikalisches Institut, Rheinische Friedrich-Wilhelms-Universität Bonn, Nussallee 12, Bonn, 53115, NRW, Germany
2 Instituto de Física Teórica (UAM/CSIC), Universidad Autónoma de Madrid, Cantoblanco, 28049, Madrid, Spain
3 Deutsches Elektronen-Synchrotron DESY, Notkestr. 85, 22607 Hamburg, Germany
4 II. Institut für Theoretische Physik, Universität Hamburg, Luruper Chaussee 149, 22761 Hamburg, Germany
* e-mail: bechtle@physik.uni-bonn.de
** e-mail: sven.heinemeyer@cern.ch
*** e-mail: jenny.list@desy.de
**** e-mail: gudrid.moortgat-pick@desy.de
† e-mail: georg.weiglein@desy.de
Published online: 18 December 2024
Some highlights of the physics case for running an e+e− collider at 500 GeV and above are discussed with a particular emphasis on the experimental access to the Higgs potential via di-Higgs and (at sufficiently high energy) triple Higgs production. The information obtainable from Higgs pair production at about 500 GeV is compared with the prospects for the HL-LHC and with the indirect information that can be obtained from a Higgs factory running at lower energies.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.