Issue |
EPJ Web Conf.
Volume 316, 2025
The 21st International Conference on Strangeness in Quark Matter (SQM 2024)
|
|
---|---|---|
Article Number | 07003 | |
Number of page(s) | 4 | |
Section | Detector Upgrades, Future Experiments and Other Topics | |
DOI | https://doi.org/10.1051/epjconf/202531607003 | |
Published online | 27 January 2025 |
https://doi.org/10.1051/epjconf/202531607003
Fast timing silicon R&D for the future Electron-Ion Collider
1 Los Alamos National Laboratory, USA
2 CERN, Switzerland
3 University of Valencia, Spain
4 Massachusetts Institute of Technology, USA
* e-mail: xuanli@lanl.gov
Published online: 27 January 2025
The proposed Electron-Ion Collider (EIC) will utilize high- luminosity high-energy electron+proton (e + p) and electron+nucleus (e + A) collisions to solve several fundamental questions including searching for gluon saturation and studying the proton/nuclear structure. Complementary to the ongoing EIC project detector technical prototype carried out by the ePIC collaboration, a Depleted Monolithic Active Pixel Sensor (i.e., MALTA2) based fast timing silicon tracking detector (FMT) has been proposed to provide additional hits for track reconstruction in the forward region at the EIC to improve the overall track reconstruction quality. The fast timing resolution of the MALTA2 technology will help reject background events at the EIC as well. Progress of latest MALTA2 R&D, the development of a new MALTA2 quad-sensor prototype module and impacts of the proposed FMT in EIC physics studies will be discussed.
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.