Study on the implementation of NuScale SMR in Doicesti, Romania
1 Dept. Reactor Physics / Doctoral School of Energy Engineering, RoPower Nuclear S.A. / National University of Science and Technology POLITEHNICA Bucharest, Bucharest, Romania This email address is being protected from spambots. You need JavaScript enabled to view it.
2 Dept. Instrumentation and Control, RoPower Nuclear S.A., Bucharest, Romania
3 Dept. Operational Readiness / Doctoral School of Energy Engineering, RoPower Nuclear S.A. / National University of Science and Technology POLITEHNICA Bucharest, Bucharest, Romania
4 Dept. Systems and Processes, RoPower Nuclear S.A., Bucharest, Romania
* Corresponding author: This email address is being protected from spambots. You need JavaScript enabled to view it.
Published online: 11 June 2026
Abstract
The ongoing shift toward low-carbon energy production has renewed interest in advanced nuclear technologies, particularly compact reactor designs. Small Modular Reactors (SMRs) build upon the operating experience of conventional nuclear power plants while introducing a modular and integrated configuration, together with improved passive safety features.
© The Authors, published by EDP Sciences, 2026
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.