Open Access
| Issue |
EPJ Web Conf.
Volume 363, 2026
International Conference on Low-Carbon Development and Materials for Solar Energy (ICLDMS’26)
|
|
|---|---|---|
| Article Number | 01004 | |
| Number of page(s) | 7 | |
| Section | Energy Materials | |
| DOI | https://doi.org/10.1051/epjconf/202636301004 | |
| Published online | 16 April 2026 | |
- D.Patel, N.Yadav, Construction project management through earned value management system, Int. J. Adv. Res. Eng. Sci. Manag. (2018). [Google Scholar]
- F. Farid, A. Rehman, M. T. Bashir, M. M. H. Khan, M. A. Uddin, H. A. Qureshi, M. I. Abbas, Synergistic effects of corn stalk ash and fly ash on the properties of lightweight concrete using pumice aggregate, Iran. J. Sci. Technol. Trans. Civ. Eng. 49(2), 1245–1257 (2025). [Google Scholar]
- Elsaid, M., Nassar, K., Alqahtani, F. K., & Abotaleb, I., Comparative Analysis of Earned Value Management Techniques in Construction Projects, Scientific Reports 15(1), 23606 (2025). [Google Scholar]
- E. Soliman, Integrating Risk Management and Earned Value Framework in Infrastructure Projects, J. Risk Construction Eng. Mgmt. (2024). [Google Scholar]
- V. Aramali, An Effective Earned Value Management System (EVMS) Framework and Its Impact on Project Performance, J. Project Mgmt. Practice 2024. [Google Scholar]
- S. M. Elseufy, A. Hussein & M. Badawy, A Comprehensive Framework for Evaluating Bridge Project Rework Through EVM and BIM, Sci. Rep. 16, 7197 (2026). [Google Scholar]
- U. Muharremi, Applying Earned Value Management for Enhanced Cost and Schedule Control in Public Works Projects, Politecn. Thesis (2025). [Google Scholar]
- Yeremia B. Mokalu et al., Implementation of Earned Value Management in Analyzing Construction Delays Using Python, J. Adv. Educ. Sci. 6(1), 36–42 (2026). [Google Scholar]
- Azaria Andreas & N. Tinumbia, Construction Project Control Using EVM, ESM, and Earned Duration, J. Infrastruktur Eng. 9(2), 4943 (2022). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.

